Connected Detailing Workflow
We do three things on a plumbing package, in this order: build the model, coordinate it against the other trades, then extract the drawings. Most problems on a plumbing package are created in the first two and paid for in the third.
Plumbing has limited flexibility once below-slab and embedded work is installed. Sanitary routing is constrained by required slopes, pipe sizes and connection elevations, and sleeve locations may need to be coordinated before concrete placement. Where project sequencing requires it, below-slab work can be prioritised and issued ahead of the above-ground package.